Jump to content

NASA X-Hab 2025: Modular Robotic Construction: Difference between revisions

From Aurora Robotics
Updated for relevancy.
No edit summary
 
(8 intermediate revisions by the same user not shown)
Line 4: Line 4:
[[File:Nasa xhab.jpg|thumb|NASA X-Hab Logo]]
[[File:Nasa xhab.jpg|thumb|NASA X-Hab Logo]]


<p>In early 2024, NASA released a request for proposals addressing the construction of a permanent lunar base. [https://lawlor.cs.uaf.edu/~olawlor/ Dr. Orion Lawlor] led the Aurora Robotics Team's proposal in response to Appendix B of the [https://spacegrant.org/wp-content/uploads/2024/03/M2M-X-Hab-Challenge-Solicitation-2025.pdf NASA RFP document], sponsored by NASA's Autonomous Robotic Construction Projects - TLT, PASS, ARMADAS. The proposal outlines the development of a modular robot capable of autonomous construction on the lunar surface.</p>
<p>In 2024, [https://spacegrant.org/wp-content/uploads/2024/03/M2M-X-Hab-Challenge-Solicitation-2025.pdf NASA's M2M X-Hab Academic Innovation Challenge for 2025] was released, for which [[Main Page|the Aurora Robotics Lab]] at the University of Alaska Fairbanks was accepted and funded through NASA’s 2024–2025 Moon to Mars X-Hab Academic Innovation Challenge. Our goal was to explore modular robotic construction techniques for lunar infrastructure, especially focusing on micrometeoroid-resistant arch structures made from modular steel trusses and covered in lunar regolith, with a clear path to fully autonomous robotic construction.</p>
 
<p>The project culminated in the development of the [[Excahauler|Excahauler robotic platform]] with a custom-built arm and end-effector, capable of aligning and assembling scaled modular truss components. Despite limitations in time and resources, the team demonstrated capabilities including truss manipulation, partial structural testing, and scale backfilling with regolith simulant (snow).</p>
 
<p>This wiki page is a very abridged version of our [https://docs.google.com/document/d/1N_494oalexJXKeGfjDocUZKAdBZPZ5RYqvyGjyIhMkg/edit?tab=t.0 full final report] which should soon be added to [https://ntrs.nasa.gov/ NASA's NTRS database].</p>


<h2>Project Vision and Mission</h2>
<h2>Project Vision and Mission</h2>
<ul>
<ul>
   <li><strong>Long-Term Vision:</strong> Transform the solar system using robotic construction with local materials.</li>
   <li><strong>Long-Term Vision:</strong> Transform the solar system using robotic construction with local materials.</li>
   <li>'''Short-Term Vision:''' Robotic construction of Artemis Base Camp.</li>
   <li><strong>Short-Term Vision:</strong> Develop robotic infrastructure construction technologies for the Artemis Base Camp.</li>
   <li><strong>Mission:</strong> Design and demonstrate robots capable of autonomously constructing Artemis Base Camp structures using locally sourced Lunar regolith, focusing first on an arch-based, regolith-covered vehicle bay.</li>
   <li><strong>Mission:</strong> Design and demonstrate robotic tools and modular structures capable of assembling scalable micrometeoroid-resistant lunar shelters.</li>
</ul>
</ul>


<h2>Concept of Operations</h2>
<h2>The L-Truss System</h2>
<p>A single robot design uses multiple tools to excavate regolith, compact foundations, and place construction modules. This project will prototype the robot's design and operations using simulations and physical demonstrations.</p>
[[File:L-Truss.jpg|alt=The final full-steel L-Truss design.|thumb|The final full-steel L-Truss design.]]
 
<p>The primary structural innovation was the development of the <strong>L-Truss</strong>: A modular trapezoidal truss segment. These trusses connect via push-fit endplates and spring-loaded capture pins to form straight or curved assemblies, including arches and retaining walls. The final full-steel design used plasma-cut end plates with a 3D printed door latch-style connection. However, full robotic connection could not be demonstrated with this design, so we made some last minute changes. The final prototype design included:</p>
<h2>Approach</h2>
<p>The project employs a multi-phase approach, including:</p>
<ul>
<ul>
   <li><strong>System-level Simulation:</strong> Using game engines like Godot to simulate regolith terrain and predict mechanical loads.</li>
   <li>Hybrid steel construction with 3D printed carbon-fiber polycarbonate alignment funnels.</li>
   <li><strong>Component Testing:</strong> Vacuum chamber and outdoor Alaska tests to validate component performance.</li>
   <li>Spring-loaded pin latching mechanisms for tool-free robotic assembly.</li>
   <li><strong>Earth Analog Testing:</strong> Full-scale robot demonstrations in physical environments.</li>
  <li>Optional upright members for regolith support and buckling resistance.</li>
   <li>Final tested form: 1.5m long, ~3kg, with a base angle of 22.5°.</li>
</ul>
</ul>
<p>A scale 3D printable version is publicly available: [https://www.printables.com/model/1305834-trapezoidal-l-truss-clip-together-construction-mod L-Truss Model]</p>


<h2>Key Questions</h2>
<h2>Structure Requirements</h2>
<ul>
<ul>
   <li>What body plans allow a robot to perform both horizontal and vertical construction?</li>
   <li>Accommodate 2.6m x 2.6m vehicles within the constructed arch structure. (I.0)</li>
   <li>What module shapes are best for robotic assembly using local materials?</li>
  <li>Truss segments must remain under 2.0 meters for transport and robotic handling. (I.1.1)</li>
   <li>Regolith shielding: Support ≥0.2m regolith equivalent for radiation/thermal protection. (O.0)</li>
  <li>Minimum compressive load capacity of 300 kgf with ≥2.0 safety factor. (I.1.2, I.2.1)</li>
  <li>Robot-compatible assembly path: all actions must have potential for automation. (E.0, E.2)</li>
</ul>
</ul>


<h2>Alignment with NASA Objectives</h2>
<h2>Concept of Operations</h2>
<p>The proposal aligns with NASA's Moon-to-Mars Architecture by:</p>
[[File:Arch Assembly Graphic.png|alt=A graphical representation of the truss section assembly process. |thumb|A graphical representation of the truss section assembly process. This is to be done in parallel with other truss sections (i.e., ones behind the one visible) to create a full truss structure.]]
<h3>Lunar Deployment Plan</h3>
<ol>
  <li><strong>Site Preparation:</strong> The Excahauler prepares a foundation using excavation tools.</li>
  <li><strong>Truss Deployment:</strong> Trusses are unloaded from a logistics lander and staged for assembly.</li>
  <li><strong>Structural Assembly:</strong> Robots assemble the arch structure according to the graphic on the right.</li>
  <li><strong>Backfilling:</strong> Lunar regolith is put over the structure via ballistic throwing or traditional scooping.</li>
  <li><strong>Use Phase:</strong> Covered arches serve as shielding for sensitive lunar equipment or crew.</li>
</ol>
 
<h3>Ground Demonstration Activities</h3>
<ul>
<ul>
   <li>Demonstrating autonomous construction capabilities.</li>
   <li>1:10 scale arch model tested with regolith simulant (basalt dust).</li>
   <li>Scaling ISRU (In-Situ Resource Utilization) for lunar operations.</li>
   <li>Full-scale hybrid trusses fabricated and manipulated via teleoperation.</li>
   <li>Supporting a mix of autonomous and teleoperated robotic operations.</li>
   <li>Robotic assembly verified using [[Excahauler]] and custom-built 2500:1 reducer gearbox arm.</li>
</ul>
</ul>


<h2>Project Phases</h2>
<h2>Project Phases</h2>
<ol>
<ol>
   <li><strong>Design:</strong> Requirements and system design during Fall 2024.</li>
   <li><strong>System Definition Review (SDR):</strong> October 4, 2024</li>
   <li><strong>Prototype:</strong> Build and component testing in Spring 2025.</li>
  <li><strong>Preliminary Design Review (PDR):</strong> November 15, 2024</li>
   <li><strong>Integration:</strong> System-level breadboard tests to achieve a Technology Readiness Level of 4-5.</li>
   <li><strong>Critical Design Review (CDR):</strong> January 24, 2025</li>
  <li><strong>Progress Checkpoint Review (PCR):</strong> April 18, 2025</li>
   <li><strong>Final Report:</strong> May 23, 2025</li>
</ol>
</ol>


<h2>Budget</h2>
<h2>Robot System: [[Excahauler]]</h2>
<p>Total funding requested: $14,580.</p>
<ul>
<p>Funding covers undergraduate student labor and project development costs.</p>
  <li>Originally designed for the [[Project Archives|2022 NASA Break the Ice Challenge]].</li>
  <li>Outfitted with a custom modular manipulator arm with 3D printed stepped planetary gearboxes.</li>
  <li>Used in successful teleoperated tests to transport and align L-Truss segments.</li>
</ul>
 
<h2>Software and Simulation</h2>
[[File:X-Hab LUNATIC Software Stack.png|alt=The modified LUNATIC software stack for the X-Hab 2025 project; adds support for the truss manipulator arm.|thumb|The modified LUNATIC software stack for the X-Hab 2025 project; adds support for the truss manipulator arm.]]
<p>The team developed and tested robotic workflows using the following tools:</p>
<ul>
  <li><strong>[[LUMINSim|Godot-based simulator:]]</strong> Visualized structure assembly and layout.</li>
  <li><strong>[https://github.com/auroraRoboticsLab/MiningRobot?tab=readme-ov-file#lunatic Custom autonomy stack (LUNATIC):]</strong> Handles teleoperation, control, and vision.</li>
  <li><strong>[https://docs.ros.org/en/humble/index.html ROS2] / [https://moveit.picknik.ai/main/index.html MoveIt]:</strong> Inverse kinematics modeled, full integration for automation incomplete.</li>
</ul>


<h2>Team</h2>
<h2>Testing and Validation</h2>
<ul>
<ul>
   <li><strong>Project Lead:</strong> Dr. Orion Lawlor</li>
   <li>FEM analysis showed safety factor >2.6 under 500N compressive loads.</li>
   <li><strong>Team Members:</strong> Andrew Mattson (CS BS/MS), Elliot Madsen (ME BS), Delano Horner (ME BS), Daniel Schliesing (ME BS), Kory Lamme (ME BS)</li>
   <li>Hybrid trusses withstood >500N axial loads; failure occurred at 230N in bending.</li>
   <li><strong>Construction Expert:</strong> Dr. Nima Farzadnia</li>
   <li>1/10 scale arch supported >12kg in Earth gravity, equivalent to 36+ tonnes in Mars gravity at full scale.</li>
</ul>
</ul>


<h2>Educational Integration</h2>
<h2>Educational Integration</h2>
<p>The project will be integrated into UAF's computer science curriculum as a special topics course in Fall 2024 and as a systems design seminar in Spring 2025.</p>
<p>Project integrated into UAF's CS 493 (Fall) and CS 454 (Spring), providing hands-on systems engineering experience to undergraduates and graduate students in mechanical and computer science disciplines.</p>
 
<h2>Outreach Activities</h2>
<ul>
  <li><strong>UAF Party in the Park:</strong> Public engagement event with live robot demos.</li>
  <li><strong>FTC Robotics Tours:</strong> Guided tour for K–12 robotics students.</li>
  <li><strong>UAF Engineering Open House:</strong> Structural demo and recruiting opportunity.</li>
</ul>
 
<h2>Lessons Learned</h2>We were not able to complete our promised deliverables to full satisfaction due to time constraints and lack of defined leadership structure. We learned important lessons about:<ul>
  <li><strong>Structure:</strong> Even small teams benefit from defined leadership and task ownership.</li>
  <li><strong>Planning:</strong> Conservative scoping ensures project deliverables can be met.</li>
  <li><strong>Fabrication:</strong> Early design-for-manufacturing saves time and enables iteration.</li>
</ul>
 
<h2>Future Work</h2>
<ul>
  <li>Complete full-scale robotic arch assembly.</li>
  <li>Fully integrate MoveIt into robotic control stack for autonomous alignment.</li>
  <li>Refine end-effector precision and truss fabrication for large-scale repeatability.</li>
</ul>


<h2>Additional Information</h2>
<h2>Additional Information</h2>
<p>For more details, please contact Dr. Orion Lawlor at oslawlor@alaska.edu.</p>
 
* Project Lead: [[User:Acmattson3|Andrew Mattson]], UAF CS BS/MS student
* Faculty Advisor: [[User:Lawlor|Dr. Orion Lawlor]] (oslawlor@alaska.edu)
* Team Members:
** [[User:Frozenstiff|Elliott Madsen]] (ME BS)
** Delano Horner (ME BS)
** Daniel Schliesing (ME BS)
** Kory Lamme (ME BS)

Latest revision as of 13:13, 7 July 2025

This is a stub. You can help by expanding it.

Overview

NASA X-Hab Logo

In 2024, NASA's M2M X-Hab Academic Innovation Challenge for 2025 was released, for which the Aurora Robotics Lab at the University of Alaska Fairbanks was accepted and funded through NASA’s 2024–2025 Moon to Mars X-Hab Academic Innovation Challenge. Our goal was to explore modular robotic construction techniques for lunar infrastructure, especially focusing on micrometeoroid-resistant arch structures made from modular steel trusses and covered in lunar regolith, with a clear path to fully autonomous robotic construction.

The project culminated in the development of the Excahauler robotic platform with a custom-built arm and end-effector, capable of aligning and assembling scaled modular truss components. Despite limitations in time and resources, the team demonstrated capabilities including truss manipulation, partial structural testing, and scale backfilling with regolith simulant (snow).

This wiki page is a very abridged version of our full final report which should soon be added to NASA's NTRS database.

Project Vision and Mission

  • Long-Term Vision: Transform the solar system using robotic construction with local materials.
  • Short-Term Vision: Develop robotic infrastructure construction technologies for the Artemis Base Camp.
  • Mission: Design and demonstrate robotic tools and modular structures capable of assembling scalable micrometeoroid-resistant lunar shelters.

The L-Truss System

The final full-steel L-Truss design.
The final full-steel L-Truss design.

The primary structural innovation was the development of the L-Truss: A modular trapezoidal truss segment. These trusses connect via push-fit endplates and spring-loaded capture pins to form straight or curved assemblies, including arches and retaining walls. The final full-steel design used plasma-cut end plates with a 3D printed door latch-style connection. However, full robotic connection could not be demonstrated with this design, so we made some last minute changes. The final prototype design included:

  • Hybrid steel construction with 3D printed carbon-fiber polycarbonate alignment funnels.
  • Spring-loaded pin latching mechanisms for tool-free robotic assembly.
  • Optional upright members for regolith support and buckling resistance.
  • Final tested form: 1.5m long, ~3kg, with a base angle of 22.5°.

A scale 3D printable version is publicly available: L-Truss Model

Structure Requirements

  • Accommodate 2.6m x 2.6m vehicles within the constructed arch structure. (I.0)
  • Truss segments must remain under 2.0 meters for transport and robotic handling. (I.1.1)
  • Regolith shielding: Support ≥0.2m regolith equivalent for radiation/thermal protection. (O.0)
  • Minimum compressive load capacity of 300 kgf with ≥2.0 safety factor. (I.1.2, I.2.1)
  • Robot-compatible assembly path: all actions must have potential for automation. (E.0, E.2)

Concept of Operations

A graphical representation of the truss section assembly process.
A graphical representation of the truss section assembly process. This is to be done in parallel with other truss sections (i.e., ones behind the one visible) to create a full truss structure.

Lunar Deployment Plan

  1. Site Preparation: The Excahauler prepares a foundation using excavation tools.
  2. Truss Deployment: Trusses are unloaded from a logistics lander and staged for assembly.
  3. Structural Assembly: Robots assemble the arch structure according to the graphic on the right.
  4. Backfilling: Lunar regolith is put over the structure via ballistic throwing or traditional scooping.
  5. Use Phase: Covered arches serve as shielding for sensitive lunar equipment or crew.

Ground Demonstration Activities

  • 1:10 scale arch model tested with regolith simulant (basalt dust).
  • Full-scale hybrid trusses fabricated and manipulated via teleoperation.
  • Robotic assembly verified using Excahauler and custom-built 2500:1 reducer gearbox arm.

Project Phases

  1. System Definition Review (SDR): October 4, 2024
  2. Preliminary Design Review (PDR): November 15, 2024
  3. Critical Design Review (CDR): January 24, 2025
  4. Progress Checkpoint Review (PCR): April 18, 2025
  5. Final Report: May 23, 2025

Robot System: Excahauler

  • Originally designed for the 2022 NASA Break the Ice Challenge.
  • Outfitted with a custom modular manipulator arm with 3D printed stepped planetary gearboxes.
  • Used in successful teleoperated tests to transport and align L-Truss segments.

Software and Simulation

The modified LUNATIC software stack for the X-Hab 2025 project; adds support for the truss manipulator arm.
The modified LUNATIC software stack for the X-Hab 2025 project; adds support for the truss manipulator arm.

The team developed and tested robotic workflows using the following tools:

Testing and Validation

  • FEM analysis showed safety factor >2.6 under 500N compressive loads.
  • Hybrid trusses withstood >500N axial loads; failure occurred at 230N in bending.
  • 1/10 scale arch supported >12kg in Earth gravity, equivalent to 36+ tonnes in Mars gravity at full scale.

Educational Integration

Project integrated into UAF's CS 493 (Fall) and CS 454 (Spring), providing hands-on systems engineering experience to undergraduates and graduate students in mechanical and computer science disciplines.

Outreach Activities

  • UAF Party in the Park: Public engagement event with live robot demos.
  • FTC Robotics Tours: Guided tour for K–12 robotics students.
  • UAF Engineering Open House: Structural demo and recruiting opportunity.

Lessons Learned

We were not able to complete our promised deliverables to full satisfaction due to time constraints and lack of defined leadership structure. We learned important lessons about:

  • Structure: Even small teams benefit from defined leadership and task ownership.
  • Planning: Conservative scoping ensures project deliverables can be met.
  • Fabrication: Early design-for-manufacturing saves time and enables iteration.

Future Work

  • Complete full-scale robotic arch assembly.
  • Fully integrate MoveIt into robotic control stack for autonomous alignment.
  • Refine end-effector precision and truss fabrication for large-scale repeatability.

Additional Information